搜索
图标

SPWLA Petrophysics Journal / January 2020

New technology provides imaging in oil- and water-based muds

PixStar is a logging-while-drilling technology that provides high-resolution images, regardless of the mud type used. 

读这篇文章
图标

科威特/ 2020年4月

Ultrasonic images identify breakout and bed boundaries

Kuwait Oil Company used PixStar technology to identify bed boundaries and borehole breakout in a 6-inch wellbore.

阅读案例研究
图标

中东/ 2019年11月

Operator identifies fractures, optimizes completion design

PixStar imaging identified 255 reservoir features, 包括126个层界, 63年骨折, 50个痘, 16个高角度功能.

阅读案例研究
4

超声波传感器

90°

Angle increments around circumference

2,000

脉冲每秒

图标

德克萨斯州/ 2019年12月

High-resolution images for real-time wellbore stability

High-resolution imaging enabled borehole condition monitoring while drilling and identified zones of borehole enlargement. 

阅读案例研究
Make better drilling decisions. 确定骨折. 优化你的完成.
Make better drilling decisions. 确定骨折. 优化你的完成.

Enable better wellbore coverage 

The PixStar high-resolution ultrasonic imaging service takes high-quality images in oil- and water-based mud, giving operators the information to make informed drilling decisions in real time. The logging-while-drilling (LWD) service measures borehole sizes and shapes, 显示骨折, 缺点, 和更多的.

  • High-resolution images identify fractures, 缺点, and 地质特征 to help optimize frac programs and maximize production
  • Real-time evaluation of borehole size and shape for understanding wellbore stability and accurate cement volume calculations
  • Identification of borehole degradation over time avoids costly well stability issues
  • Optimized high-resolution images based on hole size and ROP/RPM parameters
  • High-resolution images for high-angle or challenging wells remove the need for separate wireline run
  • Analysis of borehole size and shape allowing improved packer placement and optimization of overall completions design
图标

德州/ 2019年12月

Imaging shows fractures and features in high-angle well

PixStar imaging showed fractures and bed boundaries in a near-horizontal wellbore, removing the need for separate wireline run. 

阅读案例研究
图标

准备好迈出下一步了?

Talk with a lovejet爱博体育下载 PixStar expert

取得联系